Carlin, NV, USA
17 days ago
Carlin - Mining Engineer II/III - Studies

Position Description:

At Nevada Gold Mines, our vision is to be the world’s most valued gold mining business by finding, developing, and operating the best assets with the best people. 

NGM is currently recruiting a Mechanical Engineer to join the Engineering Studies team at NGM.  The successful candidate will be responsible for working with teams to improve and deliver growth projects through development into the Life of Mine plan.  The Mechanical Engineer will be responsible for design, costing, and scheduling of system construction related to fixed mine infrastructure within the growth projects at NGM.  Candidate will be expected to work cross functionally with Mining & Electrical Engineers to develop fit for purpose infrastructure solutions for construction of future projects. 

 At Nevada Gold Mines we are committed to a safe work environment sending every person home safe and healthy every day and leaving a sustainable legacy on our host communities. We offer a generous benefits package which includes a competitive medical, dental, and vision plan with national provider networks, a 401k retirement plan with employer contribution, paid time off, company-sponsored medical clinics, company match share purchase program, and much more!

Responsibilities:

Manage cadence for Growth Projects (ex. Steering Committee & Technical Committees) Perform scoping level design and costing on mine infrastructure systems as required by fixed plant and mine projects.  Projects are typically between $2M & $20M in capital spend and consist of pumping stations/pipe distribution systems, mine fill plant scoping/analysis/design, conveyor sizing & evaluations, and ventilation/cooling infrastructure. Evaluate and analyze various solutions for project challenges related to fixed infrastructure and provide recommendations to project team on fit for purpose solution. Host and participate in Engineering project reviews. Manage external studies supporting design development as required Communications at multiple levels within the organization around key decisions and milestones to project delivery. Develop and implement methodology/system supporting plant design and estimation as related to fixed infrastructure. Perform other duties as assigned. 

Qualifications:

Bachelor of Science in Engineering required Strong communication skills required Excellent safety record with ability to demonstrate safety leadership required Computer skills with design and analysis programs required Two (2) years’ experience in the mining industry preferred Operational understanding of power systems, pumping systems, and fixed plant in an underground mine preferred Proficient with Microsoft Suite preferred

What We Can Offer You 

A comprehensive compensation package including bonuses benefits, and stock purchase plans where applicable Ability to make a difference and lasting impact Work in a dynamic, collaborative, progressive, and high-performing team An opportunity to shape the future of mining in Nevada Opportunities to grow and learn with industry colleagues are endless Access to a variety of career opportunities across Nevada Gold Mine locations Nevada Gold Mines is committed to creating a diverse environment and is proud to be an equal opportunity employer

About Nevada Gold Mines

Nevada Gold Mines is a joint venture between Barrick Gold Corporation (61.5%) and Newmont Goldcorp Corporation (38.5%), combining their significant assets across Nevada to create the single largest gold-producing complex in the world and realize the full potential of these mines through synergies and best-in-class operational improvements.

The massive mining operation comprises 8 mines along with their associated infrastructure and processing facilities that produced an estimated 4 million ounces of gold in 2018. Three of these assets are Tier One gold mines: Barrick’s Cortez; the combination of Barrick’s Goldstrike and Newmont Goldcorp’s Carlin; and the combination of Barrick’s Turquoise Ridge and Newmont Goldcorp’s Twin Creeks. In addition, Barrick’s Goldrush-Fourmile project has the potential to become the fourth Tier One asset in this portfolio. The new JV is expected to generate around $5 billion in cost savings over the next five years. Nevada Gold Mines is operated by Barrick.

#LI-JB1

Thank you for your application, however, only those selected for an interview will be contacted

Confirm your E-mail: Send Email